From the January 2010 Issue of Big Game Fishing Journal:
In order to prepare the engine room, the crew at Jarrett Bay performed an extensive amount of work to include, but not limited to the following. After stripping the “clutter”,stringer caps were removed, lengthened, sandblasted, painted and reinstalled. The entire engine room was sanded and repainted with a two part epoxy. New wiring was installed for the power package, fuel transfer, controls, power steering, oil-exchangers and other essential systems. When the engine room was ready, the brand new CATs were stripped down to the blocks and craned through the salon door and down through the engine hatches.